Loading…
NEARC Fall 2015 has ended

Welcome to the technical sessions schedule for the 2015 Annual Fall NEARC Conference. 

NEW THIS YEAR!
 The technical schedule is capable of being sorted by date (i.e, Monday, Nov. 9) or track (i.e. USGS Hydro). You can also search for a presentation title (i.e. Harmonizing the NHD and WBD Datasets in Maine), key term (i.e. NHD), or presenter last name (i.e. O’Neil-Dunne). The sort and search functions can be found on the navigation panel on the right side of this page. If you hover over the "Schedule" button, you’ll also see different schedule view options (i.e. Grid or Simple). Try selecting each of them to see which view you prefer. 

MY SCHEDULE FEATURE: It is not required of you to create a Sched.org account to use this site but if you do so, you’ll be able to use the "My Schedule" feature which allows you to create your own schedule for the conference. Click the "Sign Up" button in the top right corner of this page to create a Sched.org account. 

MAIN NEARC WEBSITE: Click here to return to the main NEARC conference website for poster abstracts, GIS Educators Day schedule, and full conference schedule at-a-glance. 

Tuesday, November 10 • 11:00am - 11:30am
Mobile and Online Solutions for Bridge Inspection, Management and Maintenance

Sign up or log in to save this to your schedule, view media, leave feedback and see who's attending!

Amy Haas*, Josh Cone-Roddy* – VHB

VHB is working with the City of Worcester, MA Department of Public Works to develop a GIS database to monitor the condition of their bridge assets and to create a bridge asset management plan.  A geodatabase was created to store several various bridge point layers.  It was built out using Esri’s Local Government Information Model (LGIM) and supplemented with the MassDOT Inspection Report fields.  Various web applications were created in ArcGIS Online to allow the end users to quickly view, chart, edit and query the bridge attributes to review the condition of the bridges and categorize bridges with structural deficiencies.  Ultimately, it will be used in conjunction with the bridge asset management plan to prioritize funding for repairs and coordinate maintenance of their critical infrastructure.  The presentation will describe the project, discuss the benefits and advantages of the chosen approach, and demonstrate the applications used.


Tuesday November 10, 2015 11:00am - 11:30am EST
Lake Champlain A

Attendees (0)